![]() ![]() You may empty diked areas by pumps or ejectors however, you must manually activate these pumps or ejectors and must inspect the condition of the accumulation before starting, to ensure no oil will be discharged. (1) Restrain drainage from diked storage areas by valves to prevent a discharge into the drainage system or facility effluent treatment system, except where facility systems are designed to control such discharge. (a) Meet the general requirements for the Plan listed under § 112.7, and the specific discharge prevention and containment procedures listed in this section. If you are the owner or operator of an onshore facility (excluding a production facility), you must: If you are the owner or operator of a facility subject to this part you must prepare a Plan in accordance with good engineering practices. § 112.7 General requirements for Spill Prevention, Control, and Countermeasure Plans. Operator Title: Community Relations Organization: Central Arizona Project Address: PO Box 43020 City: Phoenix, AZ Fax: 62 Phone: 62. § 112.8 - Spill Prevention, Control, and Countermeasure Plan requirements for onshore facilities (excluding production facilities). ![]() (a) The owner or operator of any non-transportation-related onshore facility that, because of its location, could reasonably be expected to cause substantial harm to the environment by discharging oil into or on the navigable waters or adjoining shorelines shall prepare and submit a facility response plan to the Regional Administrator, according to the following provisions. Afren Energy Resources, a subsidiary of Afren plc, is the operator of the field and holds 50% working interest. The field's reserves are estimated at 25mmbbls of oil. The field was discovered in 1973 by Japan Petroleum. The Okoro field lies at a water depth of 46ft in block OML 112, which is situated about 12km off the shore of Nigeria.
0 Comments
Leave a Reply. |